1, the general assembly quality control section for the list of the existing control standards adjusted to the temporary reception standards for control, until the problem is corrected.<br>2, the assembly plant for the problem list of the assembly quality strictly controlled, so that the assembly of the gap / order difference characteristics can meet the requirements of temporary transition standards.<br>3, the research and development department for the list of issues one by one list of rectification plans and clear improvement cycle.<br>4, some of the other responsible units of the problem needs the relevant responsible units as soon as possible to implement the problem, and list the improvement plan and rectification cycle.
正在翻译中..