Prior and after installation of MATERIALS and/or EQUIPMENT,SUBCONTRACTOR shall inspect all painting and other permanentprotective coatings to check for damage or deterioration that has occurred during delivery to WORK SITE and installation. All such damage and deterioration shall be rectified by SUBCONTRACTOR, and the same or fully compatible paint system as was originally applied shall be used