Regarding to the installation works of street lights in the CCA Reservoir, it will be scheduled on 13/07/2020 Monday at 10:00 for the power connection to the circuit breaker switch CAS7 and CAS8 in the CCA Siphon House. Before the connection work, please sign the Lock Out/Tag Out form to confirm the power off.