Due to the inconsistency of the length of the tube bundle of the manual transmission and the automatic transmission, separate trial installation is required. <br>The prototype of the manual transmission model has been completed. <br>Changes will be made after the trial installation of automatic transmission models is completed within this week.
正在翻译中..