On April 26th a turn-to-improvement team was set up to conduct a 4M analysis of the issue and a temporary measure was developed;<br>1, A/B class on-site assembly staff have been process training, the assembly work instructions are proficient, after job observation to meet the operating requirements;<br>2, the site is equipped with a plaster rag and press rollers, combined with the operation of the operating instructions, on-site verification in line with the design and process requirements;<br>3, after on-site work observation and offline assembly test, Guizhou Red Yang-A2100 seal does not meet the technical conditions of on-site assembly, suspension of supply / immediate rectification;<br>4, the general assembly issued a new version of the operation guidance document, and the bottom coating adhesive bonding test;<br>5, accelerate the promotion of wiper fixed cover and sealing strip supply system process approval.
正在翻译中..