2019年质量问题追踪项目共开展了3个子项目;分别在交付质量问题改进、PDI问题改进和过程质量问题改进中取得了不同程度的成绩;交付质量问题改的英语翻译

2019年质量问题追踪项目共开展了3个子项目;分别在交付质量问题改进、

2019年质量问题追踪项目共开展了3个子项目;分别在交付质量问题改进、PDI问题改进和过程质量问题改进中取得了不同程度的成绩;交付质量问题改进:在去除重复问题后共立项19个问题,截至2019年末,共关闭16个问题,剩余3个问题已有具体的改进措施;PDI质量问题改进:共立项5个问题,截至2019年末,共关闭4个问题,剩余1个问题已申请延期,目前进展正常;过程质量问题改进:共立项52个问题,截至2019年末,共关闭29个问题,剩余23个问题,其中20个问题进展正常,有3个问题推进缓慢。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
2019 quality issue tracking project carried out a total of three sub-projects; respectively in the delivery of quality improvement, PDI issue improvement and process with varying degrees of performance quality improvement; <br>delivery of quality improvement: total project 19 after removal of duplication issue, as of the end of 2019, a total closure of 16 questions, there are specific measures to improve the remaining three issues; <br>PDI quality improvement: a total of five project issue, as of the end of 2019, a total closure of four questions, one question has applied for the remaining extension is proceeding normally; <br>the process of quality improvement: A total of 52 project issue, as of the end of 2019, a total of 29 questions closed, the remaining 23 questions, 20 questions in which progress is normal, there are three problems slow progress.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
In 2019, three sub-projects were carried out in the quality problem tracking project, and different degrees of achievement were made in the quality problem improvement of delivery, the improvement of PDI problem and the improvement of process quality problem.<br>Quality improvement of delivery quality: 19 issues were resolved after the removal of duplicate issues, and by the end of 2019, 16 issues had been closed, with the remaining 3 issues having been specifically improved;<br>PDI quality issue improvement: a total of 5 issues, as of the end of 2019, a total of 4 closed issues, the remaining 1 issue has been applied for extension, the current progress is normal;<br>Improvement of process quality issues: a total of 52 issues, as of the end of 2019, a total of 29 closed questions, the remaining 23 questions, of which 20 issues are progressing normally, 3 issues are moving slowly.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In 2019, the quality problem tracking project carried out three subprojects, and achieved different degrees of achievements in delivery quality problem improvement, PDI problem improvement and process quality problem improvement;<br>Improvement of delivery quality problems: a total of 19 problems have been approved after eliminating duplicate problems. By the end of 2019, 16 problems have been closed, and the remaining three problems have specific improvement measures;<br>Improvement of PDI quality problems: 5 problems have been set up in total, 4 problems have been closed by the end of 2019, the remaining 1 problem has been applied for extension, and the current progress is normal;<br>Improvement of process quality problems: a total of 52 problems have been established. By the end of 2019, 29 problems have been closed, and the remaining 23 problems, 20 of which are progressing normally, and 3 are advancing slowly.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: