Second, the construction process should be precautions and specific construction methods<br>In the construction project, often due to the negligence of a link, resulting in the entire construction process, so should be bold in the construction, to avoid mistakes, at the same time to master the basic construction methods, in order to ensure safe and orderly construction at the same time, to ensure the quality of the first construction of the project.<br>1, strict inspection of the quality of construction materials. In the selection of construction materials, to fully meet the design requirements, and even strength and quality to completely exceed the quality standards required for construction. Mainly in the selection of steel strands, to choose the relevant qualifications or quality proof of the steel strands, strictly put an end to materials not up to the standard into the construction site. First of all, the selection of materials from the appearance of the material, no appearance damage is the most basic, at the same time serious corrosion distortion deformation and other conditions also do not meet the construction requirements. Secondly, on the technical indicators, the steel stranding sleb sitmusts that the quality must meet or even exceed the relevant provisions of the current GB5224-85 standard, and meet the requirements of 186Mpa's quality technical conditions, which can meet the construction standards after the inspection of mechanical properties.<br>2, in strict accordance with the technical requirements of the construction. In cutting steel strands, to use special steel strand cutting equipment, before cutting to ensure that the cut two sections tied firmly, to avoid cutting work process, the stranding loose pick-up injuring people, steel stranding, to strictly in accordance with the requirements of the formation, measure the specific value of the segment spacing, in accordance with the design drawing order requirements of the beam number. The diameter and quality of the bellows pipe used for construction should meet the design requirements, in the handling material or construction process, to effectively prevent welding sparks from touching the bellows or steel strands of steel bundle surface, while the metal casing and beam head anchor pad to maintain the vertical angle with the steel bundle.<br>3, in accordance with the construction procedures to coordinate the construction methods. In strict accordance with the construction procedures, in a methodical and systematic manner according to the actual situation of the construction site, the adoption of scientific construction methods, overall arrangements for the progress of construction. Common construction methods are perforation, beam perforation, watering, pulling and pipe pulp. Holes generally need to make positioning maps, installation of positioning networks, installation of bellows, vents several steps. In the construction of beam and watering, we should pay attention to the correct operation method of vibrator, so as to avoid the impact of vibrator and bellows. When pulling, pay attention to the strength and symmetrical exertion, grasp the initial pull and force control. The quality requires that the steel strand elongation value and the calculation value error should be controlled within 6%, and the wire broken beam should not exceed 1. In addition to retaining 5cm, the excess part is cut off and sealed with cement. In the pipeline pulp construction, in addition to strictly control the end time of Zhangla, the pressure pulp cement water ash than control is more stringent. At the same time to ensure that the anchor out of the pulp door out of the thick pulp can be closed, the hole into the pulp valve, to ensure that the pressure reaches 0.6 -0.7Mpa, and lasts 2 minutes in the absence of leakage can be closed.
正在翻译中..