(1) The minimum maximum completion time: refers to the minimum completion time of the workpiece with the longest time required to complete the processing of each workpiece in the scheduling plan, which is an important indicator to measure the scheduling plan. Generally, the shorter the maximum completion time, the higher the production efficiency and the lower the manufacturing cost. It can be expressed as: (2) <br>Among them, is the completion time of the workpiece.
正在翻译中..