成本管理就是运用项目成本计划来衡量项目实际所取得的经济成果。项目成本管理通过动态分析的方法找出成本偏差值,并且检查成本实际执行情况,通过有效的英语翻译

成本管理就是运用项目成本计划来衡量项目实际所取得的经济成果。项目成本管

成本管理就是运用项目成本计划来衡量项目实际所取得的经济成果。项目成本管理通过动态分析的方法找出成本偏差值,并且检查成本实际执行情况,通过有效的纠正方法,从而使项目成本顺利完成。成本管理主要包括实时对比成本计划和实际成本之间的差异,并分析找出偏差的原因,并记录成本计划在工程成本的变更,防止不合理的项目成本计划在成本预算中并且将变更结果通知项目管理人员。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Cost management is to use the project cost plan to measure the actual economic results achieved by the project. Project cost management finds the cost deviation value through dynamic analysis, and checks the actual cost implementation, and through effective correction methods, so that the project cost is successfully completed. Cost management mainly includes real-time comparison of the difference between the cost plan and the actual cost, and analysis to find the cause of the deviation, and record the change of the cost plan in the engineering cost, prevent the unreasonable project cost plan in the cost budget and notify the change result Project management staff.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Cost management is the use of project cost planning to measure the actual economic results achieved by the project. Project cost management finds the cost variance value through dynamic analysis and checks the actual performance of the cost, and makes the project cost successfully through effective corrective methods. Cost management mainly includes real-time comparison of the differences between cost planning and actual costs, and analyzes the cause of the deviation, and records the change skewed of the cost plan in the engineering cost, prevents unreasonable project cost planning from being budgeted in the cost budget, and informs project managers of the results of the changes.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Cost management is to use the project cost plan to measure the actual economic achievements of the project. The project cost management finds out the cost deviation value through the dynamic analysis method, and checks the actual implementation of the cost, through the effective correction method, so that the project cost can be completed smoothly. Cost management mainly includes comparing the difference between cost plan and actual cost in real time, analyzing and finding out the cause of deviation, recording the change of cost plan in project cost, preventing unreasonable project cost plan from being in cost budget and informing the project management personnel of the change result.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: