Thank you very much for doseonyhoo's work. Next, we will consider the implementation plan, and we will communicate and request accurate information with the contractor in time.A, the power capacity increase of the computer room We need to meet the power capacity increase of not less than 60A. The main control distribution box is installed in the computer room, and then it is distributed to the power demand of each cabinet and the line distribution of UPS power supply unit.B. According to the load-bearing requirement of each cabinet of 500KG, we need to explain the situation and requirements with the construction for additional reinforcement links; Improve the requirements according to the load-bearing requirements of the building itself; We will ask the interior designer to consider it. The design plan also needs your confirmation;C. Currently, the number of cabinets used is 6 server rooms, and about 90 servers providing services need to be put on shelves, among which 4 cabinets are used for daily office network equipment; With a large number of machines, we need to consider the refrigeration requirements of the air conditioner in the computer room;D. Because of the standard, the current office uses the network patch in the network room on each floor, and directly provides the network cable to each employee's desk. Just follow your method.
正在翻译中..