If the inspection and design documents submitted by the ship surveyor and designer do not meet the quality requirements, they shall be liable for defects and breach of contract. Surveyor, designer<br>Those who fail to submit survey and design documents within the time limit specified in the contract shall bear the responsibility for delay in performance. Article 280 of the contract law stipulates that the quality of survey or design does not meet the requirements or construction<br>Duration of work,<br>
正在翻译中..