- Filling & compacting in layers including leveling & grading to the required levels. - Removing from site surplus aggregate materials after completion. 4. Precast Concrete and granite Curbs 4.01 Curb edges are given separately, stating the dimensions or type. 4.02 Curb edges are given in linear meters. 4.03 Work is deemed to include: a. Excavation in any material whatsoever encountered. b. Backfilling and disposal of surplus excavated material. c. Concrete foundations and haunching including reinforcement and formwork. d. Bedding and jointing. e. Ends, angles and intersections including special units. f. Cutting. g. Curved work to any radius. 093014 LANDSCAPE TILING 1. Bases to tiling. 1.01 Excavation and filling are measured in cubic meters and given in accordance with the rules contained in section 031000 of the Method of Measurement. 1.02 Any fill/excavation required to match the paving required levels are covered under the unit pavers section.