The problem has exceeded the reason analysis and the reply cycle of temporary measures, and has not been replied<br>The test joint of the air reservoir has been effectively controlled, and the air leakage problem of the water drain valve cannot be effectively controlled at present, so it is recommended to upgrade to L2 for solution.<br>
正在翻译中..