Include torque control, each shift line at least 10 units per day, the average distribution.<br>"1, OM457 models in the oil gauge is not blocked to receive the status quo.<br>2, the adoption of the oil ruler insertion need to use both hands to assist the program.<br>3, the final inspection for the above two points to adjust the inspection standards. "<br>For the side beacon/side steering light is not on, 100% pull the external inspection section to confirm, and replace the faulty lamp.<br>The last 20 sets of rear combined lights are required, and the problem is confirmed by the supplier field service personnel at the final inspection.<br>Testing for the removal of air conditioning filling port for failed vehicles.<br>In view of the air leakage problem, the failure parts provided by the assembly are tested.<br>Compare the guides on glass for both suppliers.<br>For the failure of the car pull inspection will be air conditioning filling port removal for testing.<br>Identify standard operating documentation requirements and control areas.<br>Refine the assembly process of the production line and issue OK standards for problem points.<br>Improvement conclusions are required by 28 August.
正在翻译中..