(2) Performance After tested, the connector shall satisfy the requirements specified in the sections enumerated below. During Test d), check the connector for possible instantaneous disconnection. 2.2.1 Voltage drop (After each of the tests) 2.2.2 Wire fastening force (After each of Test h)) 2.2.6 Temperature rise (After each of Tests b), d), f) and h), but b), and f) shall be omissible if so specified.) 2.2.13 Airtightness (After Test h)) 2.3.21 Crash-impact resistance (After Test h))