The on-site gas release valve and gas inlet and outlet interface shall be installed and formed according to the drawing. The lifting rings, steel cables and other components in the rear valve release device shall be installed on site. The lifting ring shall be welded with the equipment top cover plate and gas interface. When installing wire rope and other relevant tensioning and fixing devices, it shall ensure that the included angle between the vertical release pipe and the wire rope is not less than 45 degrees. When installing the release valve, the operating handle shall be facing the operating platform.
正在翻译中..