It is strictly prohibited to weld the positioning reinforcement support and structural reinforcement, and the welding method on the additional reinforcement or additional stirrup is adopted.<br>5) During formwork installation, sponge strip must be pasted at the joint of flat joint, and the bottom of formwork must be sealed with mortar in advance, and concrete can be poured only when the strength is up
正在翻译中..