This paper mainly expounds the problems of poor continuous operation and frequent failure of the cathode copper stripping unit due to the defects of system program design and unreasonable installation layout in the operation process, and analyzes the factors affecting the operation time of the unit. Through system optimization and equipment re layout, the unit operation failure is reduced, the unit idle time is reduced, and the unit operation efficiency is ensured to be more than 99%.<br>
正在翻译中..