These limitations do not require that a casting be scrapped if repairs are beyond these limits, however, further processing of a casting that falls outside of these limits may only be performed when granted permission by a written deviation from the responsible Supplier Quality Engineer, Product/Portfolio Manager, or the Lead Engineer of the Product Group.