Through the research on the design of three super high-rise core tubes and elevators, the author deeply realized that these two aspects are related to the success or failure of the project quality. At the beginning of the plan, multiple rounds of discussions should be organized, and detailed scientific analysis and calculations should be organized. The core tube of a super high-rise building integrates service spaces such as elevator shafts, fire stairwells and front rooms, mechanical and electrical equipment rooms, pipeline wells and toilets. The size, location and layout of the core tube and building functions, building shape and plane shape and other factors closely related.
正在翻译中..