Section 8: Post Repair and Pre-Delivery Inspections 8.1 POST REPAIR INSPECTIONEvery container must be examined by the depot’s own inspector following repair completion. The inspector must check that the repair is completed as per the approved repair estimate. The container should be assessed to ensure it is fit for service, according to the Seaco’s criteria. DOM might also conduct joint inspection with depot from time to time and/or assign 3rd party inspector to conduct post repair inspections.The overall dimensions and the minimum internal dimensions and door openings correspond to ISO standards: ISO 668: 1995 and ISO 1496-1: 2013.8.2 PRE-DELIVERY INSPECTIONEvery container being delivered to a lessee must be examined immediately prior to delivery.Depot need to check and ensure the instruction in release authorization is strictly followed prior to delivery.