质量、外检拉动物流包装科对零部件器具进行排查。主要针对生产过程磕碰、划伤问题零部件接到外检科提供的20套后组合灯后,对零部件导致灯不亮的问题的英语翻译

质量、外检拉动物流包装科对零部件器具进行排查。主要针对生产过程磕碰、划

质量、外检拉动物流包装科对零部件器具进行排查。主要针对生产过程磕碰、划伤问题零部件接到外检科提供的20套后组合灯后,对零部件导致灯不亮的问题拉动供应商现场服务人员进行确认,并更换故障灯"1、落实内饰质量门为什么两个班组记录不同,相似问题是否可以统一记录模式。2、内饰质量门发现问题后100%拉动外检进行确认,必要时留车分析。"检验项目前移至静检质量门将问题点纳入力矩控制,每天每个班线最少10台,平均分布。"1、OM457车型在机油尺不被遮挡的情况下接收现状。2、采纳机油尺插入时需用双手辅助的方案。3、终检针对以上两点调整检验标准。"针对侧标志灯/侧转向灯不亮问题,要求100%拉动外检科进行确认,并对故障灯进行更换。要求提供后20套后组合灯,由供应商现场服务人员在终检对问题进行确认。针对失效车将空调加注口拆除进行检测针对漏气问题,对总装提供的失效件进行检测针对两个供应商的玻璃上导轨进行对比检测针对失效车拉动外检将空调加注口拆除进行检测明确标准作业文件要求及控制区域细化生产线装配工艺,针对问题点下发OK标准要求在8月28日前出改进结论
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The Quality and External Inspection pulls the Animal Flow Packaging Division to conduct inspections on parts and appliances. Mainly for bumps and scratches in the production process. After <br>receiving the 20 sets of rear combination lights provided by the External Inspection Department, the supplier’s on-site service personnel are encouraged to confirm the problem of the parts causing the lights to not turn on, and replace the fault lights. <br>"1 implementation of quality interior doors Why two different team record, whether similar problems can be unified recording mode. <br>2, the interior door found that 100% quality problems after pulling the external examination to confirm, leaving the car analysis, if necessary. " <br>moved to the quiet before the inspection project quality inspection door <br>to problems into the torque control, a minimum of 10 lines each class every day, evenly distributed. <br>"1. The OM457 model accepts the current situation when the oil dipstick is not obstructed. <br>2. The solution that requires the assistance of both hands when the oil dipstick is inserted is adopted. <br>3. The final inspection adjusts the inspection standards for the above two points." For <br>the side marker lamp/side The turn signal does not light up, and it requires 100% to pull the external inspection department to confirm and replace the fault light. <br>It is required to provide the last 20 sets of rear combination lights, and the supplier’s on-site service personnel will confirm the problem during the final inspection. <br>Detect the dismantling of the air-conditioning filler port for the failed car. Inspect <br>the failed parts provided by the final assembly for the air leakage problem. <br>Compare and test the glass guide rails of the two suppliers. Clarify the standard operation document requirements and control the area to refine the assembly process of the production line, and issue the OK standard for the problem points. Improve the conclusion before August 28<br><br><br><br>
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Quality, external inspection pull logistics packaging section of the parts and components of the appliances for inspection. Mainly for the production process bump, scratch problem parts.<br>After receiving 20 sets of rear combined lights provided by the External Inspection Section, the problem of the components causing the lights not to turn on pulls the supplier field service personnel to confirm and replace the faulty lights.<br>"1, the implementation of the interior quality door why the two teams record different, similar issues can be unified recording mode.<br>2, interior quality door found the problem after 100% pull external inspection to confirm, if necessary, stay car analysis. "<br>The inspection item is moved forward to the static quality gate.<br>The problem points are incorporated into torque control, with an average distribution of at least 10 lines per shift per day.<br>"1, OM457 models in the oil gauge is not blocked to receive the status quo.<br>2, the adoption of the oil ruler insertion need to use both hands to assist the program.<br>3, the final inspection for the above two points to adjust the inspection standards. "<br>For the side beacon/side steering light is not on, 100% pull the external inspection section to confirm, and replace the faulty lamp.<br>The last 20 sets of rear combined lights are required, and the problem is confirmed by the supplier field service personnel at the final inspection.<br>Testing for the removal of air conditioning filling port for failed vehicles.<br>In view of the air leakage problem, the failure parts provided by the assembly are tested.<br>Compare the guides on glass for both suppliers.<br>For the failure of the car pull inspection will be air conditioning filling port removal for testing.<br>Identify standard operating documentation requirements and control areas.<br>Refine the assembly process of the production line and issue OK standards for problem points.<br>Improvement conclusions are required by 28 August.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Quality and external inspection pull the logistics packaging department to check the parts and tools. It mainly aims at the parts with bumps and scratches in the production process<br>After receiving 20 sets of rear combination lamps provided by the external inspection department, the supplier's on-site service personnel were pulled to confirm the problem of light failure caused by parts and components, and replace the fault light<br>"1. Why are the records of interior quality door different between the two teams, and whether the record mode of similar problems can be unified.<br>2. When problems are found in the interior quality door, pull the external inspection 100% for confirmation, and leave the vehicle for analysis if necessary. "<br>Inspection items moved forward to static inspection quality gate<br>The problem points are included in the torque control, and each shift line has at least 10 sets per day, with average distribution.<br>"1. Om457 models receive the status quo without the oil dipstick blocked.<br>2. Adopt the scheme of using both hands to assist when inserting the oil dipstick.<br>3. The final inspection adjusts the inspection standard according to the above two points. "<br>In view of the problem that the side marker lamp / side steering light is not on, it is required to pull the external inspection department 100% to confirm and replace the fault lamp.<br>After 20 sets of rear combination lamps are required to be provided, and the supplier's on-site service personnel shall confirm the problems in the final inspection.<br>In view of the failure of the car, the air conditioning filler is removed for detection<br>Aiming at the problem of air leakage, the failure parts provided by the general assembly were detected<br>The glass guide rails of two suppliers were compared and tested<br>In view of the failure vehicle pulling external inspection, the air conditioning filler was removed for detection<br>Define the standard operation document requirements and control area<br>Refine the assembly process of the production line and issue the OK standard for the problem points<br>It is required to make improvement conclusion before August 28<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: