Quality, external inspection pull logistics packaging section of the parts and components of the appliances for inspection. Mainly for the production process bump, scratch problem parts.<br>After receiving 20 sets of rear combined lights provided by the External Inspection Section, the problem of the components causing the lights not to turn on pulls the supplier field service personnel to confirm and replace the faulty lights.<br>"1, the implementation of the interior quality door why the two teams record different, similar issues can be unified recording mode.<br>2, interior quality door found the problem after 100% pull external inspection to confirm, if necessary, stay car analysis. "<br>The inspection item is moved forward to the static quality gate.<br>The problem points are incorporated into torque control, with an average distribution of at least 10 lines per shift per day.<br>"1, OM457 models in the oil gauge is not blocked to receive the status quo.<br>2, the adoption of the oil ruler insertion need to use both hands to assist the program.<br>3, the final inspection for the above two points to adjust the inspection standards. "<br>For the side beacon/side steering light is not on, 100% pull the external inspection section to confirm, and replace the faulty lamp.<br>The last 20 sets of rear combined lights are required, and the problem is confirmed by the supplier field service personnel at the final inspection.<br>Testing for the removal of air conditioning filling port for failed vehicles.<br>In view of the air leakage problem, the failure parts provided by the assembly are tested.<br>Compare the guides on glass for both suppliers.<br>For the failure of the car pull inspection will be air conditioning filling port removal for testing.<br>Identify standard operating documentation requirements and control areas.<br>Refine the assembly process of the production line and issue OK standards for problem points.<br>Improvement conclusions are required by 28 August.
正在翻译中..