The problem that the side signs/side turn signals/signal lights are not turned on is included in the comprehensive quality gate for control, and the South Square confirms the repair status. <br>Temporary inspection standards are formed according to the way of dropping, and the inspectors are trained to focus on controlling the dropping phenomenon. Statistics the failure rate. <br>In response to the problem of abnormal sound of door opening and closing, it is required to feedback the fault point video to the improvement group to <br>organize external inspection, procurement, and R&D to evaluate together according to the supplier, and improve according to the evaluation situation. <br>Remove the entire set of faulty and non-faulty parts of the faulty car Contrast check and <br>pull the designer to confirm the problem, such as increasing the torque value can eliminate the problem, it is recommended to write a contact form to request the design to change the torque requirements. <br>Re-receipt the project and issue an improvement plan by next Tuesday. <br>Organize the general assembly and quality personnel to conduct trial assembly review according to the trial assembly plan, and issue a change order after the verification measures are qualified. <br>Re-evaluate the problem of abnormal noise at the junction after the car, and issue an improvement plan to <br>implement the second trial installation time, and organize relevant personnel to conduct a trial installation review <br>technology to determine whether the film needs to be distinguished between winter and summer. If necessary, Clarify the difference between the two states and whether there is a difference in adhesive strength. <br>Provide an upgrade report for <br>procurement , and upgrade the problem. Procurement Department organizes relevant units to conduct a sample review of the film.
正在翻译中..