The Main Contractor shall prepare a detailed specification, isometric drawings and line designation tables for the Insulation Contractor according to the materials selected, including tables showing operating temperatures, type of insulation and economic insulation thickness, all of which shall be approved by the Principal. For items that are not covered in the DEP or CINI Manual, the Main Contractor shall carry out a detailed design of the insulation system.