The adopted design criteria is the separation of the fuel tanks in two sub-systems, named “Af” (blue) and “Bf” (red), each one of which will have enough capacity to guarantee the SRtP voyage. Tank group “Af” will work together with Propulsion and Power Generation system “Ap”, same for “Bf”.