5. ANNEX II. SUPLIERS PAINTING PROCEDURESOn current annex, they are attached applicable manufaturer’s standards systems.All of themare suitable for the operational temperature and are guanteed during operational guaranteeperiod.1. Control valves painting procedure (FLOWSERVE)2. Security valves (BAKER HUGHES)3. Burner (PILLARD)4. Turbine and gearbox (ELLIOT/LUFKIN)5. Fans, IGV and actuator (GRUBBER)6. Motors (ABB)7. Motorized valves (ARFLU/ROTORK/AUMA)8. Lube oil system (RIVI)