On April 11, the workshop resumed production of the skipped bubble after rework, producing 2000PCS with a defect rate of 95PCS and a defect rate of 4.75%. After analysis, it was confirmed to be a gas leak.
On April 11, the workshop resumed production of the jump bubble after rework, producing 2000PCS, bad 95PCS, the bad rate of 4.75%, after analysis was confirmed as a leak.
On April 11, the workshop resumed production of the reworked blister, producing 2000 PCs, 95 PCs defective, with a defect rate of 4.75%, which was confirmed as air leakage after analysis.<br>