Info Baseline depends on deliverables of COs which need to be changed. Can be more than one per CR :As Required: DOORS-RequirementsAs Specified :Concept, SRDAs Designed: EBOM, Drawings, 3DAS to be Built: MBOM, Production OrdersAs Built: Car History Book