During the use of sluice, there may be various adverse situations. The water free period after completion of construction is that before the sluice is built and put into use, the vertical load is the largest, and it is easy to sink or uneven sink. The design stability calculation needs to consider the completion period, design water level combination, check water level combination and seismic situation. The design seismic intensity is Ⅶ, so the seismic situation needs to be considered.<br>The combination of the completed water free period and the design water level is the basic load combination, and the check water level and the seismic water level are the special combination, see table 6-1 for details.
正在翻译中..