2.14 Work Instructions 2.14.1 A complete set of work Instructions will be laminated and tethered to the fixture. 2.14.2 Fixture work instructions must clearly describe the initial set-up of a fixture, the loading of the part, the sequence of the clamping operation and clear instructions for all feature inspections. 2.14.3 All components referenced in the work instruction must be clearly labeled. 2.14.4 The correct clamping sequence must be determined by a GR&R study. The clamping sequence will be documented in the work instruction once an acceptable GR&R has been approved.