Xypex applications thus began in April of 2016, with Xypex Concentrate being applied within the interior of the affected box girder, areas of the bridge deck, Pylon P6 and various related concrete components. Through strict process management and control during the treatment of approximately 10,000 square meters of internal and external surfaces, the application of Xypex proved a complete success, ensuring the ‘healing’ of a residual of cracks as well as the restoration of integrity and durability throughout the stress-impacted concretes.
Xypex applications thus began in April of 2016, with Xypex Concentrate being applied within the interior of the affected box girder, areas of the bridge deck, Pylon P6 and various related concrete components. Through strict process management and control during the treatment of approximately 10,000 square meters of internal and external surfaces, the application of Xypex proved a complete success, ensuring the ‘healing’ of a residual of cracks as well as the restoration of integrity and durability throughout the stress-impacted concretes.
正在翻译中..