1. The changes, reasons and application units included in the PCN are recorded in the ERP system; <br>2. The change data of the PCN are recorded in the quality assurance system; <br>3. The approval process of the PCN is recorded in the BPM system. <br>Involved in standard changes, training will be carried out on the new standards. <br><br>Engineering change verification records <br>are stamped with the red wording "Temporary Document", and the validity period does not exceed two months. When the validity period of the document expires, it will be automatically abolished.