Insulation materials should be kept dry during construction, its water content shall not be greater than the natural water content under the meteorological conditions at that time, waterproof coil construction in rain-free conditions, when laying coils where yin angle, yang angle and shape changes should be reinforced treatment, especially in the roof waterproof and rainwater port connection, must be carefully constructed to ensure its tight and seamless. Pre-buried drainage pipes should be effectively and reliably protected during construction to ensure that concrete and other debris fall into the stormwater pipe.
正在翻译中..