If the updated system documents are not provided within the time limit, a system review shall be arranged. If the audit fails, the supplier's supply shall be stopped, and the audit passed requires the supplier to complete the system document update within 1 month, and arrange to be on-site for full inspection of incoming materials after the deadline.
正在翻译中..