1. Use raw material to repair the faulty vehicle in the debugging process. <br>2. External inspection feedback: a thicker sealing ring that can be used temporarily has been found, and the tightness is to be verified
1, the commissioning link using raw material belt repair faulty vehicles<br>2, external inspection feedback: has found a temporary use of the thicker seal, to verify the sealing
1. Use raw material belt to repair the fault vehicle in the debugging link<br>2. External inspection feedback: coarse sealing ring which can be used temporarily has been found, and its sealing performance is to be verified<br>