Lifting for the Construction and Assembly StageDuring the construction and assembly stages until provisional acceptance, all the necessary lifting means for said activities must be provided; For the correct selection of the hoist, the weight, dimensions and volume of the equipment and its components must be taken into account, as well as the spaces in which they will be installed.1. traveling cranesThe areas of the Power Plant that require the installation of traveling cranes are indicated in the following table: