The Works Contractor shall provide surface protection for all valves as detailed in the Protective Coatings Specification, XXXX-C0000-PI-SP-00010. The Works Contractor may provide their surface protection details to the EPCM for approval.
The Works Contractor shall provide surface protection for all valves as detailed in the Protective Coatings Specification, XXXX-C0000-PI-SP-00010. The Works Contractor may provide their surface protection details to the EPCM for approval.<BR>