在设备安装前,应首先根据基础图检查地基的施工情况。应以零平面为基准,检测每一个安装位置是否符合图纸要求并做记录。同时建筑人员应根据基础图用墨的英语翻译

在设备安装前,应首先根据基础图检查地基的施工情况。应以零平面为基准,检

在设备安装前,应首先根据基础图检查地基的施工情况。应以零平面为基准,检测每一个安装位置是否符合图纸要求并做记录。同时建筑人员应根据基础图用墨线在地面上画出安放设备的位置线,以供安装设备时参考。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Before installation, according to the construction should first check the case of FIG base foundation. Should be zero as a reference plane, each mounting position detecting whether the drawings and recorded. Meanwhile The base construction should draw lines in FIG ink surface location cord device, for reference during installation.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
About The Topography survey: The process of how the survey will be summarized in the file "requires a BETA survey" and the results of the survey work will be reported in the "BETA Topography Survey Reports" file (the file includes only the headings to perform , the content will be updated when the survey ends)<br>About geotechnical survey and Geological Survey (Geological Survey): The volume of Geological Survey (geotechnical survey) will be hosted by the project request and geological Engineers (geologists) will conduct survey, analysis and geological assessment of the project as requested by the owner M the project, steps for implementing this survey will be summarized in the "Request for a BETA survey" file. In Vietnam, the results of geotechnical survey and Geological Survey will be reported in 1 single file "Report of BETA Geological Survey work" (the file includes only the headings will execute, the content will be updated when the survey work ends)<br>About hydrological survey, PEC will carry out Hydrometeorologic survey (hydrological survey), this work has included the Hydrological Task (hydrograph survey): The Hydrometeorological survey will not perform groundwater assessment of the project (for This work will be done and reported in the Geotechnical Survey and Geological Survey section), the Hydrometeorologic survey will include tasks such as collecting documents, the necessary data on hydrogeological and regional climate to cater for design work , ). The steps for implementing this survey will be summarized in the "Request for a BETA survey" file and the results of the survey will be reported in the "BETA hydrometeorological Survey Report" file (the file includes only headings that will perform , the content will be updated when the survey is finished). ...
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Before equipment installation, the foundation construction shall be checked according to the foundation drawing. The zero plane shall be taken as the benchmark to check whether each installation position meets the requirements of drawings and make records. At the same time, the construction personnel shall draw the location line of the equipment on the ground with ink line according to the foundation drawing for reference when installing the equipment.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: