According to the confirmation plan, this confirmation was strictly carried out according to the plan. The confirmation plan was not modified during the implementation process, and there were no deviations. All performance indicators of the confirmation plan were not changed during the confirmation process. All work was carried out in accordance with the standard operating procedures and confirmation plan requirements, and the confirmation results IQ and PQ met the requirements. This process confirmation meets the requirements, and it is recommended to approve and take effect.<br>1.1 Equipment of the confirmed object<br>1.2 Reconfirmation criteria<br>1. Equipment relocation shall be based on the transfer of production areas and locations. The floor relocation of equipment shall be based on the results that do not affect the process judgment. If it does not affect, it is not necessary to do so. If it affects, it needs to be done, and IQ needs to be re executed; If there is no change in IQ display, there is no need to execute OQ and PQ;<br>2. Due to equipment overhaul or replacement of core components, IQ needs to be re executed; If there is no change in IQ display, there is no need to execute OQ and PQ;<br>3. If there are new devices, IQ must be performed on the new devices; If there is no difference between the new equipment and the original equipment, there is no need to execute 0Q, but PQ must be executed;<br>4. When unstable quality during the production process may affect product quality<br>5. When changing materials, compared to the complexity of the confirmed materials (refer to the comparison method described in the material selection description), if the materials are more complex, reconfirmation is required to execute OQ and PQ, but IQ may not be executed;<br>6. When changing parameters, operating methods, or acceptance criteria, it is necessary to reconfirm the execution of OQ and PQ;<br>7. Perform reconfirmation according to the periodic reconfirmation time specified in the "Mindray Process Confirmation Master Plan".<br>1.3 Best Parameter Table<br>Drying process parameters:
正在翻译中..