In the first mock exam, the components needed for system design are as的简体中文翻译

In the first mock exam, the compone

In the first mock exam, the components needed for system design are assembled, including the soldering iron, solder and so on. The corresponding circuit diagram is found, and the corresponding devices are located for welding. When the welding module is installed, the circuit module is welded. The power supply is started from the power source and the microcontroller circuit is carried out one by one. Each module must be tested to ensure that the power supply is not short circuited. There is no tin slag to prevent signal short circuit. Only when the measurement is normal, can the test be powered on. Any short circuit or poor contact may burn the circuit. It is necessary to test step by step. The common abnormal phenomena shall be checked clearly. The components with positive and negative pole requirements shall not be connected reversely, or the components will be burned. After the physical assembly and welding is completed, the power on verification can be carried out. When the power is turned on, confirm whether the power supply is normal again. After the power supply is normal, start the power supply, the system led works, and the power indicator light is on. At this time, you can burn the code to the single chip microcomputer. After the code is burned, observe whether the system status is correct, verify the system function, and then carry out the verification The verification of other functions shall be carried out according to the functional requirements of the system. After all functions are verified, the physical power on test is completed. To test the display module, the key problem in this step is whether the pins of magnetic field data collection correspond to the program one by one. In addition, there are the contrast and backlight settings of the display screen. If they are not set properly, they cannot be displayed normally. After debugging, the display function of the system is normal.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
在第一次模拟考试中,组装了系统设计所需的组件,包括烙铁,焊料等。找到相应的电路图,并找到相应的设备进行焊接。安装焊接模块后,电路模块即被焊接。从电源开始供电,微控制器电路一个接一个地执行。必须对每个模块进行测试,以确保电源未短路。没有锡渣可防止信号短路。仅当测量正常时,才能打开测试电源。任何短路或接触不良都可能烧毁电路。有必要一步一步地进行测试。常见的异常现象应清楚检查。具有正极和负极要求的组件不得反接,否则组件将被烧毁。物理组装和焊接完成后,可以执行开机验证。打开电源后,请再次确认电源是否正常。电源正常后,启动电源,系统指示灯亮,电源指示灯亮。此时,您可以将代码刻录到单片机。代码烧录完成后,观察系统状态是否正确,验证系统功能,然后进行验证。其他功能的验证应根据系统功能要求进行。验证所有功能后,完成物理开机测试。要测试显示模块,这个步骤的关键问题是磁场数据采集的引脚是否与程序一一对应。此外,还有显示屏的对比度和背光设置。如果设置不正确,将无法正常显示。调试完成后,系统显示功能正常。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
In the first mock exam, the components needed for system design are assembled, including the soldering iron, solder and so on. The corresponding circuit diagram is found, and the corresponding devices are located for welding. When the welding module is installed, the circuit module is welded. The power supply is started from the power source and the microcontroller circuit is carried out one by one. Each module must be tested to ensure that the power supply is not short circuited. There is no tin slag to prevent signal short circuit. Only when the measurement is normal, can the test be powered on. Any short circuit or poor contact may burn the circuit. It is necessary to test step by step. The common abnormal phenomena shall be checked clearly. The components with positive and negative pole requirements shall not be connected reversely, or the components will be burned. After the physical assembly and welding is completed, the power on verification can be carried out. When the power is turned on, confirm whether the power supply is normal again. After the power supply is normal, start the power supply, the system led works, and the power indicator light is on. At this time, you can burn the code to the single chip microcomputer. After the code is burned, observe whether the system status is correct, verify the system function, and then carry out the verification The verification of other functions shall be carried out according to the functional requirements of the system. After all functions are verified, the physical power on test is completed. To test the display module, the key problem in this step is whether the pins of magnetic field data collection correspond to the program one by one. In addition, there are the contrast and backlight settings of the display screen. If they are not set properly, they cannot be displayed normally. After debugging, the display function of the system is normal.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
在第一次模拟考试中,对系统设计所需的部件进行了组装,包括烙铁、焊料等。找到相应的电路图,并定位相应的器件进行焊接。安装焊接模块时,焊接电路模块。电源由电源启动,单片机电路逐一执行。必须对每个模块进行测试,以确保电源没有短路。无锡渣,防止信号短路。只有当测量正常时,测试才能通电。任何短路或接触不良都可能烧坏电路。有必要一步一步地测试。对常见异常现象应检查清楚。对有正负极要求的部件,不得反接,否则将烧毁。实物组装焊接完成后,方可进行通电验证。接通电源后,再次确认电源是否正常。电源正常后,启动电源,系统led工作,电源指示灯亮。这时,你可以把代码烧到单片机上。代码烧录后,观察系统状态是否正确,验证系统功能,然后进行验证,其他功能的验证应根据系统的功能要求进行。所有功能验证后,物理通电测试完成。测试显示模块的关键问题是磁场数据采集的引脚是否与程序一一对应。此外,还有显示屏的对比度和背光设置。如果设置不当,则无法正常显示。经调试,系统显示功能正常。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: