Static had in August 2015 to join PCCW (Xi'an), base Fuzhou, Fuzhou responsible for system operation and maintenance projects. At that time he worked as follows:
Liang Jing joined PCCW (Xi'an) in August 2015, base Fuzhou, responsible for the system operation and maintenance of the Fuzhou project. At that time, the status of service was as follows:
Liang Jing joined PCCW (Xi'an) in August 2015 and was in charge of the system operation and maintenance of Fuzhou project. At that time, the position was as follows:<br>