Space location requirements:<br>The spatial location of the support structure is designed and arranged according to the camera point layout. The whole system is connected with the steel beam at the top of the structure through 8 rigging. Therefore, the plane projection position of 8 rigging is required to meet the coverage requirements of the truss system in the support structure. In addition, in order to ensure the beauty of truss system after installation, the lifting points corresponding to 8 steel cables should be arranged in parallel and equidistant as far as possible. For the support structure of the project, the space position of the steel beam on the top of the structure shall meet the requirements of the following hanging point layout:
正在翻译中..