Visualizations of 3D as well as 2D cooling simulation have shown that there exists no isolation in the casting.This result also validates the proper design and location of the feeder. The total solidification time required was 27.38 min and maximum and minimum temperatures of the casting observed at the end of solidification were 574?C and 150?C respectively. Fig. 10.shows casting cooling simulation.