The project is a residential building of Building 3 in Lanping County Residential District. The ground part of the building has 12 floors for residential buildings, while the underground part of the first floor is a bicycle garage. The building consists of two units, each unit has 36 houses and a total of 72 families. The construction area of the underground part is 670.06 square meters, the construction area of the above-ground part is 7,995.35 square meters, and the total construction area is 8665.41 square meters. The first underground floor is 3.4 m high, and the first to twelfth floors are 2.8 m high. The height from the outer layer of the main body to the upper layer is 34.17m. It mainly includes preparation basis, project summary, construction layout and preparation, construction methods and technical measures, construction schedule management, resource management, quality management, construction layout management, occupational health and safety management environment, energy conservation and consumption reduction management, etc.
正在翻译中..