1.03 The rate of measured work is deemed to include the costs of: all work listed in the Specification, supply, installation, and coordination with other works, accessories, labelling, concrete bases and support pads where needed, platework and supporting steelwork where needed, related builder’s works, anti-vibration mountings, electrical connections and terminations, spare parts and tools, preparing instruction manuals and spare parts lists and submitting required number of copies, all as specified and shown on drawings. 149133 LINEN CHUTES 149182 TRASH CHUTES 1. Equipment and Ancillaries 1.01 Each kind of equipment and ancillaries is given separately, stating the size and pattern, rated duty, capacity, length, etc. as appropriate. 1.02 Equipment and ancillaries are enumerated. 1.03 The rate of measured work is deemed to include the costs of: all work listed in the Specification, factory assembled components and controls,