In order to improve the quality status of bridge tunnel equipment and ensure the safety of speed-up heavy-duty transportation, the new long-line 175-bridge, 233-bridge, 234-bridge pillow hole failure is serious, major repair and replacement. The 2-hole bridge bridge surface is 48m welding under the crucible, each hole to make the installation of bridge pillow 49.1 bridge extension meters (136), the removal of the rail 59 bridge extension meters, the removal of K-type separate fasteners 272 sets; The new long-line 175-bridge for 1-32m under the bolt welding plate beam, the production and installation of bridge pillow 32.6 bridge Yanmi (90 roots), bridge head double pillow 4 roots, the removal of the guard rail 48 bridge extension meters, the removal of K-type separate fasteners 180 sets, the installation of zinc hook bolts 180 sets, zinc seepage straight bolts 90 sets, cover plate rust removal, spray zinc paint 32.6 square meters.
正在翻译中..