Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with excavated earth, watering and ramming lead upto one chain(30 m)and lift upto 5 ft. (1.5 m)" b)in ordinary soil."Supplying and filling sand under floor; or plugging in wells. (Select Fill)""Cement concrete plain including placing. compacting, finishing and curing complete (including screening and washing of stone aggregate):" (i)Ratio 1: 4: 8" Providing and laying reinforced cement concrete (including prestessed concrete using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication placing in position, etc) (a)(i) Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects:-" (i)Type(nominal mix 1: 11/2: 3)
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with excavated earth, watering and ramming lead upto one chain(30<br> m)and lift upto 5 ft. (1.5 m)<br>"<br> b)in ordinary soil.<br>"Supplying and filling sand under floor; or plugging in wells. (Select Fill)<br>"<br>"Cement concrete plain including placing. compacting, finishing and curing complete (including screening and washing of stone aggregate):<br>"<br> (i)Ratio 1: 4: 8<br>" Providing and laying reinforced cement concrete (including prestessed concrete using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication placing in position, etc) <br>(a)(i) Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects:-<br>"<br> (i)Type(nominal mix 1: 11/2: 3)
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
建筑、桥梁和其他结构地基的挖掘,包括用挖掘的泥土重新填充结构、浇水和冲压导致一个链条(30<br> m)和升降高达 5 英尺(1.5 米)<br>"<br> b)在普通土壤中。<br>"在地板上供应和填充沙;或插入井。(选择填充)<br>"<br>*水泥混凝土平原,包括放置。压实、精加工和固化完成(包括石料料的筛选和洗涤):<br>"<br> (一)比率 1: 4: 8<br>• 提供和铺设钢筋水泥混凝土(包括采用粗砂和筛选分级和洗涤的骨料预处理混凝土,所需形状和设计,包括形状、模具、快门、提升、压实、固化、渲染和精加工暴露表面,完整(但不包括钢筋成本、其制造到位等)<br>(a)(一) 屋顶板、梁、柱、梁、梁和其他结构构件的钢筋水泥混凝土,原位或预制到位,或预应力构件原地铸造,各方面完成:-<br>"<br> (一)类型(标称混合 1: 11/2: 3)
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
建筑物、桥梁及其他结构基础的开挖,包括开挖、敷设、填土周围的结构、浇筑和浇筑至一条链(30)<br>m) 提升至5英尺(1.5米)<br>"<br>b) 在普通土壤中。<br>“供应和填充地板下的沙子;或堵塞井。(选择填充)<br>"<br>“水泥混凝土素混凝土,包括浇筑。压实、修整和养护完成(包括石骨料的筛选和清洗):<br>"<br>(i) 比例1:4:8<br>“提供和铺设钢筋水泥混凝土(包括使用粗砂和筛分级配和洗涤骨料的预应力混凝土,其形状和设计符合要求,包括模板、模具、模板、提升、压实、养护、抹灰和修整外露表面,完整(但不包括钢筋成本、钢筋制造成本)就位等)<br>(a) (i)屋面板、梁、柱、过梁、大梁和其他结构构件中的钢筋水泥混凝土,现浇或预制就位,或预应力构件,全部完成尊重:-<br>"<br>(i) 类型(标称配合比1:11/2:3)
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.