R 301a/b was manufactured 10 days ago. You proposed to change the height of 1NC and 2NC from 540 to 900 mm, without any change. From the PID chart is a temperature hole, if the process can only be changed later. Now it is proposed to change 3NC. If it does not affect the process, please do not change it.<br>I want to tell you now. The equipment that has been completed manufacturing includes: V-101, V-290, V-390, V-490, V-401, TK-250, TK-250, TK-410, TK-410, MC-720, MC-721, MC-820, R301a/b. The equipment that has been manufactured now includes: C-530, C-720, C-721, C-721, C-820, C-820, C-830, TK-810 and refining platform installation, platform installation and box assembly of PK-731, platform of PK-720, platform of PK-720, platform of PK-72721, platform of PK-72721, platform of PK-72721, platform of PK-820-The results of this study are as follows:1. Dynamic manufacturing equipment: si-140ab, si-421, si-706ab, v-404, r-303ab, V-710. There are: PK-790, PK-791, KL710 and KL711 smoke pipes and smoke hood above the feeding.<br>
正在翻译中..