Combined with the basic idea of designing an incoming station, this project optimizes the connection, presents it in the design, combines the knowledge we have learned with the design method of the incoming train station, and designs. The main contents of are analyzed from the following aspects: (1) Detailed investigation of the basic situation of railway station Hengshan inside and outside the station, the distribution of passenger flow to and from Hengshan station, and Includes the presence of various areas inside and outside the station gate. (2) Understand the scope of the entrance / exit station optimization project in detail, and present an irrational plan and design at present. (3) According to the expertise learned in the Hengshan Railway System Optimization Project, the analysis of Hengshan Station inside and outside the station has problems such as the optimization of the real name confirmation port and the plaza in front of the station. Also special passengers at the station. (4) Improve and establish the content of optimization.