We have reached a cooperation with our molding factory in Yixing, and the shell materials have been shipped to Yixing. It may take one month to make a mold for shell molding. We try to use the mold from our previous supplier, but we need to confirm whether this mold matches the punching machine in Yixing. If so, we will save the time of molding the shell.
正在翻译中..